Epoxy System Builder
Describe the floor and get the system that fits, its layers in order from prep to topcoat, and why the other systems were ruled out.
Which Floor System Does This Job Need?
Answer what you know about the floor and the builder recommends a system, lays out its layers from prep to topcoat, and links each layer to the calculator that sizes it. It also tells you which systems it ruled out and why. Every rule comes from one of our system pages, so the answer never says anything those pages do not.
The system for this job
Answer what you know above and the recommended system appears here, with its layers in order and the reasons it won.
How the Epoxy System Builder Works
- Pick the kind of building, or leave it blank. It is the weakest evidence the builder uses and never decides the answer on its own
- Say what the floor has to survive: traffic, heat and water, and chemicals. These carry the most weight
- Choose the look you are after, and tick daylight, wet grip or a same-day return if they apply
- Tick anything true of the slab, and enter a moisture reading if you have one
- Read the recommended system and its layers, then open the system page before you specify anything
- Check every layer against the product data sheet. The builder narrows the choice; the data sheet decides it
Examples
Frequently Asked Questions
How does the builder decide?
Each answer triggers rules taken from our system pages. A rule either supports a system, rules it out, or attaches a caution to it. The system with the most support and nothing against it is the pick.
The weighting is deliberate: what the floor has to survive (heat, chemicals, hard wheels) counts for more than the look, and the look counts for more than the type of building. A building type on its own never produces a recommendation, because "showroom" says very little about what a floor has to do.
Why does it sometimes show two systems side by side?
Because the answers genuinely do not separate them, and picking one anyway would be a guess dressed up as an answer.
The common case is forklift lanes. Our pages support both a high-build epoxy and an epoxy mortar for hard wheels, and no published line divides them. What does divide them is the slab: a worn or spalled floor, or one that has to fall to drains, points to the mortar.
Why does it not give thicknesses, coverage or cure times?
Because those belong to the product you buy, not to the system. Two data sheets for the same kind of system can differ on every one of them.
Each layer links to the calculator that sizes it, and those calculators ask for the figures from your data sheet. That keeps the numbers where they can be checked.
What happens if my moisture reading is high?
The builder reads it against the same bands as our concrete moisture calculator. A borderline reading adds a step to hold it against the data sheet. A reading in the barrier band adds a moisture vapor barrier to every resin build, and lifts urethane cement and a densified floor, which tolerate slab moisture far better.
A reading in the top band recommends nothing. That is a stop: find out why the slab is that wet before choosing any floor.
Can it recommend a floor that is not a coating?
Yes. Polished concrete and grind and seal are both in its library, and for a floor that only needs to stop dusting, or where the client wants the concrete to show, they are often the honest answer. Many floors are coated to solve a problem a coating is not needed for.
Is the recommendation a specification?
No. It is decision support. It narrows a long list of systems to the one or two that fit what you told it, and tells you what those systems demand. The specification comes from the manufacturer's data sheets and, on a commercial job, from whoever is responsible for the specification. Read the system page before you commit to anything.
What if my job has more than one kind of floor?
Run the builder once for each area. A commercial kitchen is a good example: the cook line, the prep areas and the dry storage each want a different system, and specifying one system for the whole room usually overspends on the dry areas or under-builds the wet ones.
Important Notes
- The builder only repeats what our system pages say. Each rule is checked against the page it came from every time the site is built
- Answers left blank are treated as "no special requirement", not as a guess
- Quartz broadcast has no system page yet, so it links to the guide on single and double broadcast
- Always confirm the build against the manufacturer's data sheets, and keep one manufacturer top to bottom where a warranty depends on it