Quality Control Checklist

Every hold point on one sheet, from before prep to handover, with a log line for each coat: conditions, batches, the spread rate you achieved, and who checked. Add your business name and print it.

What it is for

One sheet per job, kept with the crew from the first day to the last. It asks the same questions at the same six hold points every time, and it is the record of what was checked, by whom and when. Why each hold point is where it is, and what to do when one fails, is in the quality control walkthrough.

The sheet

Add your details and they appear on the sheet. Nothing you type is saved or sent anywhere: it lives in this tab until you print.

Quality Control Checklist

One per job. Initial each hold point as it passes.

Installer
Phone

Job and product limits, from the data sheet

Job
System
Moisture limit
Slab temp range
Max humidity
Min dew point spread
Profile required
Spread rate
Recoat window
Induction time

1. Before prep

  • Products on site match the quote
  • Enough material for the area at the spread rate
  • Batch or lot numbers recorded
  • Cracks, joints, old coatings and sealers noted
  • Moisture tested by the product's method
  • Anything outside the quote raised with the customer
Moisture reading and method

2. After prep

  • Sound: no loose, hollow or crumbling areas
  • Repairs placed and cured
  • Profiled everywhere, edges and corners included
  • Clean: dust removed, water drop test passed
  • Dry: within the moisture limit

3 to 5. Every coat: before, first section, and after

  • Conditions inside the data sheet range
  • Recoat window still open
  • Ratio checked; induction observed
  • Spread rate checked on the first section
  • Wet film looked over for holidays and lap marks
  • Before the next coat: no pinholes, bubbles, fisheyes, soft areas
  • Broadcast floors: scraped and vacuumed; no bald spots
CoatDate, timeBatchSlab / air / RHDew pt spreadRate achievedInit.
Primer
Base / body coat
Broadcast
Topcoat 1
Topcoat 2

6. Before handover

  • Own walkthrough done
  • Punch items listed
  • Photos taken
  • Handover sheet ready

Failed checks: what failed, and what was done

Checked by
Date

Frequently Asked Questions

How do I use this on a job?

Print one per job and keep it with the crew. Tick each hold point as it passes, fill in one line of the coat log for every coat, and initial it. If a check fails, write down what failed and what you did in the notes before carrying on. The finished sheet goes in the job file with the handover sheet.

Why are the limits left blank?

Because they belong to the product. Moisture limits, temperature ranges, spread rates and recoat windows differ between products, and a checklist that printed one set would be wrong for most of the jobs it was used on. Copy them from the data sheet of the products on site at the start of the job, so the crew checks against the right numbers.

What if the job has more coats than the log has lines?

Print a second sheet and use its coat log, or write the extra coats in the notes. The log has a line each for a primer, a base or body coat, a broadcast, and two topcoats, which covers most systems.